Alfriston School for Girls
Performing arts studio using Topakustik 14/2M to control reverberation and meet BB93 requirements….
More >
Performing arts studio using Topakustik 14/2M to control reverberation and meet BB93 requirements….
More >
Aviva, St Helen’s Tower – Project Swan office project using Topakustik 14/2M….
More >
BBC Television Centre office project using Laudescher Linea 4.2.1….
More >
Beacon of Light sports facilities project using Topperfo 16/16/8 M….
More >
Bloomberg European HQ Vortex office project using Topperfo Micro perforated acoustic panels in American Red Oak….
More >
Colchester Sports Hub sports facilities project using Topperfo M 16/16/8….
More >
Sports facility with atrium, gym and indoor running track treated using Topakustik and Topperfo systems….
More >
Deloitte Office reception project using a bespoke Laudescher LINEA slatted timber acoustic system….
More >
Design Museum cultural project using Topperfo Micro 2/2/0.5 acoustic timber panels….
More >
Edenbrook Leisure Centre sports facilities project using Topperfo 16/16/8 M….
More >
Edge Grove School – External education project using Laudescher Linea 2.4.3….
More >
Edge Grove School – Internal education project using Laudescher Linea 2.6.6….
More >
Higher education teaching, lecture and catering spaces using Topakustik and Laudescher systems….
More >
Freeman’s School Swimming Pool sports facilities project using Laudescher Linea 2.4.3….
More >
Gravetye Manor restaurant project using Internal, Topakustik 14/2M. External – Topakustik 14/2M….
More >
Harris Academy schools project using Laudescher Linea – 4.2.4….
More >
Multifunction school auditorium balancing speech intelligibility and musical performance….
More >
Lecture theatre ceiling and wall treatment using Topakustik 9/2M in a sprayed white finish….
More >
Topakustik 30/2M in American Walnut for a moisture-resistant acoustic treatment in a leisure/residential setting….
More >
Bush House auditorium using matching acoustic and non-acoustic Topakustik panels….
More >
KPMG – Castle Terrace office project using Topperfo Micro, Topperfo Graphic….
More >
National Army Museum museum project using Topakustik 8/3M 9% Vertical Grooves….
More >
New Scotland Yard office project using Laudescher Linea Bespoke 2.4.3….
More >
University cafeteria and lecture theatre acoustic treatment using Topakustik 28/4M….
More >
Sixth form and arts building using Topakustik 29/3M in foyer, atria and circulation areas….
More >
Multi-sports hall using Topperfo wall coverings designed for reverberation control and impact resistance….
More >
Pension Insurance Corporation office project using Laudescher LINEA 2.6.8 slatted ceiling panels in oak….
More >
Pension Insurance Corporation office project using Topakustik Micro 2/2/0.5 acoustic ceiling panels in RAL 9010 Pure White….
More >
Places Leisure sports facilities project using Topperfo M 16/16/8….
More >
Procession House office project using Laudescher Linea 4.2.4….
More >
Project Eagle – 100 Bishopsgate office project using Laudescher Linea (Bespoke 4.9.16)….
More >
PROJECT LOOP office project using Topakustik 9/2M, 12/4M, 14/2m….
More >
School library acoustic treatment with Topakustik 8/3 to reduce reverberation and support BB93 performance….
More >
School, college, residential and theatre spaces for deaf young people, using Topperfo and Laudescher systems….
More >
Royal College of Surgeons sports facilities project using Topakustik 14/2M….
More >
Southampton University (Gower) – Reception higher education project using Topakustik 28-4 M….
More >
Southampton University (Gower) – Lecture Theatres auditoriums project using Topperfo Micro 3/3/0.5….
More >
The Grove Hotel – Glass House Restaurant restaurant project using Topakustik 14/2 M….
More >
University of Roehampton – Library higher education project using Topakustik 14/2 M Planks….
More >
Welwyn Borough Council Chamber office project using Laudescher Linea 4.2.1….
More >